Aged Care Facility – Perth Metropolitan, Western Australia

A reliable generator compliant with the client’s specification; integrated with the site’s main switchboard to perform automatic start on mains failure, was required.

After factory testing had been approved at West Power’s workshop, transportation to site, craning and positioning followed. An attenuated air intake and outlet system was installed to the plant room, in conjunction with ducting of the engine’s exhaust to outside.

  • 550kVA Standby generator complete with an acoustic weather proof canopy
  • Volvo Diesel Engine
  • Meccalte Alternator
  • Deep sea 7320 control system
  • Factory acceptance testing
  • Transport to site
  • Craning the generator into position
  • Site acceptance testing
  • Site fill of diesel fuel
  • Site acceptance witness testing